Why Early Appointment of a Fall Protection Contractor Saves Programme Days Later

Looking to protect your workforce on site? Contact us today.

Fall protection is one of the construction packages most consistently appointed late in the procurement process. The package is small relative to scaffold or groundworks, the technical complexity appears narrow, and the assumption is that any specialist can come in and install nets within a few days of being asked. In practice, this late appointment costs the developer programme days that early appointment would have saved.

The reason is design coordination. Fall protection nets require specific clearances beneath the catch zone, specific anchorage points within the surrounding structure, and specific access routes for the installation crew. Each of these needs to be present in the scaffold design, the building structure and the site sequencing. Where the fall protection contractor is appointed early, those requirements are designed in. Where the contractor is appointed late, the requirements have to be retrofitted against scaffold and structure that were not configured for them.

Retrofitting is rarely impossible, but it is rarely cheap or fast. A scaffold that was designed without considering the clearance beneath roofing work may need modification before nets can be installed safely. An anchor pattern that was not planned for in the scaffold design may need additional ties added at points that the scaffold contractor needs to revisit. An access route to the netting installation zone may need temporary modification to allow the installation crew to mobilise.

Each of these costs programme time. Each is largely avoidable through early appointment of the fall protection contractor and joint coordination at pre-construction stage.

Red Safety Netting’s preferred working pattern is appointment at scaffold design stage, with the netting requirements integrated with the scaffold drawing and with the building sequence. The benefits of early appointment compound across the live site. Scaffold modifications are minimised. Installation sequences match the build sequence. Inspections coordinate with scaffold inspections.

There is also a Construction Phase Plan benefit. CDM 2015 requires the principal contractor to coordinate health and safety across all contractors working on the site. Fall protection is one of the more visible safety-critical activities. Where the fall protection contractor has been part of the coordination conversation from pre-construction stage, the Construction Phase Plan includes considered fall protection arrangements. Where the contractor is appointed late, the Plan often contains generic fall protection assumptions that the actual contractor then has to work around or modify.

For developers and principal contractors planning new schemes, the practical step is to identify the fall protection requirements at design stage and engage the contractor before the scaffold is finalised. The contractor’s input does not have to be extensive. A few hours of design coordination delivers significant operational benefit downstream.

There is also a tender quality benefit to early engagement. A fall protection contractor responding to a scheme they have seen at design stage produces a tender that reflects the actual conditions. A contractor responding to a generic scope produces a tender that reflects generic assumptions. The variations between the tender position and the actual cost are smaller in the first case than in the second.

For framework developers and repeat clients, early appointment becomes routine. The fall protection contractor is a known partner who is engaged at the same pre-construction stage as scaffold and other key packages. The coordination becomes a default rather than a project-by-project effort.

The cost of early appointment is essentially zero. The fee structure is not different from late appointment. The contractor is being engaged either way. The only thing that changes is when. Earlier is better in every dimension that matters for the live scheme. There is no commercial argument for late appointment, only inertia in procurement processes that have historically deferred small packages until the last moment.

For developers procuring fall protection as a separate package, the practical conclusion is straightforward. Engage the contractor at scaffold design stage. The marginal additional effort at pre-construction is significantly less than the marginal additional cost on the live site if engagement is delayed.

Talk to Red Safety Netting To discuss early appointment of your fall protection contractor on your scheme, contact Red Safety Netting on 01223 890727 or email enquiries@theglobegroup.co.uk.

Looking to protect your workforce on site? Contact us today.

Safety Netting Installation

Safety Netting Installation

Correctly installed safety netting is what stands between a workforce and a fall. Red Safety Netting provides FASET-accredited safety netting installation to BS EN 1263-1 — supplied, rigged, inspected and handed over by qualified Safety Net Riggers for principal contractors and roofing trades nationwide. A safety net is only as good as its installation A…

Safety Netting Hire

Safety Netting Hire

For many projects, hiring safety netting is the most cost-effective way to provide collective fall protection — you get fully compliant, FASET-accredited fall arrest netting installed and inspected for the duration of the work, without the capital outlay of buying a system outright. Red Safety Netting offers short and long-term safety netting hire to BS…

Debris Netting Systems

Debris Netting Systems

Debris netting is a fine-mesh containment system that stops small materials — dust, fragments, offcuts, screws and nails — escaping the working area and reaching the public or operatives below. It is the system of choice for urban and public-facing scaffold and facade works. Red Safety Netting supplies and installs debris netting nationwide for principal…

Vertical Protection Nets

Vertical Protection Nets

Vertical protection nets are installed in a vertical plane around a scaffold or building perimeter to contain falling materials, tools and fragments — protecting the public, neighbouring properties and operatives below during facade, cladding and glazing works. Red Safety Netting supplies and installs vertical protection netting nationwide for principal contractors and main contractors. What vertical…

Scaffolding

Scaffolding

Scaffolding gives a safe, stable working platform and access for almost any work at height. Red Safety Netting delivers scaffolding in close partnership with our sister company Globe Scaffolding — combining their scaffolding expertise with our fall protection specialism so the whole working-at-height package can come from one group, properly coordinated. Scaffolding, backed by a…

Safety Decking

Safety Decking

Safety decking provides a stable, fully boarded working platform with built-in fall protection — a continuous safe surface to work from, and a barrier that limits the fall distance for anyone working above it. Red Safety Netting supplies and installs modular safety decking nationwide for principal contractors and main contractors. What safety decking does Safety…

Man-Safe Safety Netting

Man-Safe Safety Netting

Man-safe safety netting is the most effective collective fall protection for people working at height. Installed horizontally beneath the work area, a fall arrest net catches anyone who falls — protecting the whole workforce at once, without relying on each operative to clip on. As a FASET-accredited specialist, Red Safety Netting supplies, rigs and inspects…

Perimeter edge guardrail protection

Perimeter edge guardrail protection

Perimeter edge protection is the collective barrier that stops people and materials going over an exposed edge — a physical guardrail at roof level, on slab edges and around openings. As the first line of defence in the hierarchy of fall protection, it prevents falls rather than arresting them. Red Safety Netting supplies and installs…

safety nettingHaki stair access towers

Haki stair access towers

Haki stair access towers provide a wide, comfortable staircase up a structure — the safest and most efficient way to move people and materials between levels on a busy site. Where a ladder tower gives access, a stair tower gives flow. Red Safety Netting supplies and installs Haki stair access towers nationwide for principal contractors…

Ladder access towers

Ladder access towers

Ladder access towers provide safe, compliant vertical access to height — a stable, purpose-built tower for getting operatives and equipment up and down a structure without relying on leaning ladders. Red Safety Netting supplies and installs ladder access towers nationwide for principal contractors and main contractors. Safe vertical access to height A ladder access tower…

Looking to protect your workforce on site? Contact us today.

Complete the form and one of the team will be in contact.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.